8 Commits

Author SHA1 Message Date
e7df0322d7 Improve project usage (#6)
All checks were successful
continuous-integration/drone/push Build is passing
1. Ignore unnecessary files, such as `pgcli` log/history, and extra `docker-compose` definitions.
2. Add `Makefile` with common tasks.
3. Add git pre-commit hook to ensure project is always properly formatted.
4. Add [`btree_gist`][0] extension to `postgres`.

Reviewed-on: #6

[0]: https://www.postgresql.org/docs/14/btree-gist.html
2022-04-23 17:15:16 +00:00
Joao P Dubas
a69b771847 [extra-01] training has a period validity
We move from start/end date to a period date range to represent the
interval where a training take place.

Besides that, new constraints are added to ensure a trainings of a user
can't overlap. These constraints reflect in changeset validation.
2021-06-28 00:31:36 +00:00
Joao P Dubas
58c4601203 [day-04] add exercise schema
So a training is a collection of exercises that have a description and a
protocol to be followed.
2021-06-26 17:26:14 +00:00
Joao P Dubas
ea5616addf [day-04] add training schema
With this we can represent a traning program for a user.
2021-06-26 17:25:53 +00:00
Joao P Dubas
d578bc6cf3 [day-02] validate user input
Also improve migration to reflect requirements in validation done
through `Ecto.Changeset`.
2021-06-22 23:56:07 +00:00
Joao P Dubas
97af827bc2 [day-02] add user schema and migration
Add elixir struct to represent an user and its corresponding
representation on the database.
2021-06-22 23:55:02 +00:00
Joao P Dubas
8658384030 [day-01] phoenix project setup
Create new phoenix project
2021-06-22 01:55:16 +00:00
Joao P Dubas
f02c0ff310 [day-00] base infra for the project 2021-06-22 01:52:43 +00:00